MISO request G160

MISO queue ID G160

Queue request G160 was listed in the MISO interconnection queue at the end of 2025 as a 45 MW gas project in Dane County, WI, according to Berkeley Lab’s queue data file. The filing names Walnut substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 1, 2003.

Queue IDG160
Project nameNot reported
Status (as published)Operational
SubstationWalnut substation
Point of interconnectionWalnut 69 kV substation
CountyDane
StateWI
Voltage69 kV
Capacity45 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2003-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Walnut substation substation: 2 requests in the MISO queue, 2 active totaling 150 MW.

Queue IDProjectMWResourceStatus
G096Not reported105GasOperational

Dane, WI: 19 requests in the MISO queue, 12 active totaling 2,472.3 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2001-11-30
Interconnection agreement date2003-05-23
Operational date2003-12-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.