Tittabawassee Substation substation interconnection queue

1 active project totaling 193 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3 MISO queue filings name Tittabawassee Substation as the point of interconnection, all in Midland County, MI.

1active projects
193active MW
3total filed
Queue IDProjectkVMWResourceStatus
G687 Not reported 345 750 Coal Withdrawn
G809 Not reported 345 193 Gas Operational
J234 Not reported n/r 35 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.