Substation Scout

Shockey substation interconnection queue

2 active projects totaling 420 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
420active MW
3total filed
Queue IDProjectkVMWResourceStatus
J4041 Not reported n/r 220 Solar Active
J3087 Not reported n/r 204.6 Battery Withdrawn
J1831 Not reported 138 200 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first