Substation Scout

Reynolds - Burr Oak Line substation interconnection queue

3 active projects totaling 500 MW in the MISO queue.

3 MISO queue filings name Reynolds - Burr Oak Line as the point of interconnection, all in IN.

3active projects
500active MW
3total filed
Queue IDProjectkVMWResourceStatus
J1067 Not reported 345 240 Solar Active
J2663 Not reported 345 200 Battery Active
S1028 Surplus; J1067 345 60 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.