Substation Scout

Rapson Substation substation interconnection queue

1 active project totaling 117.5 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Rapson Substation as the point of interconnection, all in Huron County, MI.

1active projects
117.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
J546 Not reported 120 260 Wind Withdrawn
J1319 Not reported 120 117.5 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.