MISO request J1319
MISO queue ID J1319
Queue request J1319 was listed in the MISO interconnection queue at the end of 2025 as a 117.5 MW wind project in Huron County, MI, according to Berkeley Lab’s queue data file. The filing names Rapson Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of August 1, 2022.
| Queue ID | J1319 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | Rapson Substation |
| Point of interconnection | Rapson 120kV Substation |
| County | Huron |
| State | MI |
| Voltage | 120 kV |
| Capacity | 117.5 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2022-08-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Rapson Substation substation: 2 requests in the MISO queue, 1 active totaling 117.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| J546 | Not reported | 260 | Wind | Withdrawn |
Huron, MI: 41 requests in the MISO queue, 29 active totaling 4,917.9 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ITC MIDWEST |
|---|---|
| Cluster | DPP-2019 East (ITC) |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | Study Phase: GIA Complete; Post GIA Status: In Service |
| Queue date | 2019-04-29 |
| Operational date | 2022-08-01 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.