Substation Scout

Nordic substation interconnection queue

3 active projects totaling 70.5 MW in the MISO queue, plus 1 with terminal status (shown grayed).

4 MISO queue filings name Nordic as the point of interconnection, all in Dickinson County, MI.

3active projects
70.5active MW
4total filed
Queue IDProjectkVMWResourceStatus
J3642 Not reported n/r 60 Solar Withdrawn
J4085 Not reported n/r 42 Solar Active
J1814 Not reported n/r 22.5 Solar Active
J4169 Not reported n/r 6 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first