Magnolia substation interconnection queue

1 active project totaling 72 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3 MISO queue filings name Magnolia as the point of interconnection, all in Rock County, MN.

1active projects
72active MW
3total filed
Queue IDProjectkVMWResourceStatus
J1570 Not reported 161 200 Solar Withdrawn
J3397 Not reported n/r 80 Solar Withdrawn
S1078 Surplus; J1325 n/r 72 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.