Substation Scout

JACINTO - PEACH CREEK substation interconnection queue

2 active projects totaling 475.8 MW in the MISO queue.

2 MISO queue filings name JACINTO - PEACH CREEK as the point of interconnection, all in TX.

2active projects
475.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3986 Not reported 230 270 Solar Active
J3586 Not reported 230 205.8 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first