HARTBURG - AEP LAYFIELD substation interconnection queue

1 active project totaling 270 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3 MISO queue filings name HARTBURG - AEP LAYFIELD as the point of interconnection, all in Sabine Parish, LA.

1active projects
270active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3408 Not reported 500 450 Solar Withdrawn
J1890 Not reported 500 270 Solar Active
J3585 Not reported 500 150 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.