Substation Scout

MISO request J1890

MISO queue ID J1890

Queue request J1890 was listed in the MISO interconnection queue at the end of 2025 as a 270 MW solar project in Sabine Parish, LA, according to Berkeley Lab’s queue data file. The filing names HARTBURG - AEP LAYFIELD as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 30, 2027.

Queue IDJ1890
Project nameNot reported
Status (as published)Active
SubstationHARTBURG - AEP LAYFIELD
Point of interconnectionHARTBURG - AEP LAYFIELD 500.0kV
CountySabine Parish
StateLA
Voltage500 kV
Capacity270 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-09-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

HARTBURG - AEP LAYFIELD substation: 3 requests in the MISO queue, 1 active totaling 270 MW.

Queue IDProjectMWResourceStatus
J3408Not reported450SolarWithdrawn
J3585Not reported150BatteryWithdrawn

Sabine Parish, LA: 10 requests in the MISO queue, 5 active totaling 992 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY TEXAS, INC.
ClusterDPP-2021 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Not Started
Queue date2025-04-17
Interconnection agreement date2025-12-08

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first