Substation Scout

GLOSTER - LIBERTY substation interconnection queue

2 active projects totaling 240 MW in the MISO queue.

2 MISO queue filings name GLOSTER - LIBERTY as the point of interconnection, all in Amite County, MS.

2active projects
240active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3913 Not reported 115 140 Solar Active
J3231 Not reported 115 100 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first