FRANKLIN substation interconnection queue

1 active project totaling 125 MW in the MISO queue, plus 1 with terminal status (shown grayed).

1active projects
125active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1700 Not reported 230 288 Solar Withdrawn
J2087 Not reported n/r 125 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.