Substation Scout

Edwardsport Station IGCC substation interconnection queue

2 active projects totaling 150 MW in the MISO queue.

2 MISO queue filings name Edwardsport Station IGCC as the point of interconnection, all in Knox County, IN.

2active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3166 Not reported n/r 100 Battery Active
S1126 Not reported n/r 50 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first