Substation Scout

MISO request S1126

MISO queue ID S1126

Queue request S1126 was listed in the MISO interconnection queue at the end of 2025 as a 50 MW battery project in Knox County, IN, according to Berkeley Lab’s queue data file. The filing names Edwardsport Station IGCC as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 31, 2029.

Queue IDS1126
Project nameNot reported
Status (as published)Active
SubstationEdwardsport Station IGCC
Point of interconnectionEdwardsport Station IGCC
CountyKnox
StateIN
VoltageNot reported
Capacity50 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2029-05-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Edwardsport Station IGCC substation: 2 requests in the MISO queue, 2 active totaling 150 MW.

Queue IDProjectMWResourceStatus
J3166Not reported100BatteryActive

Knox, IN: 23 requests in the MISO queue, 14 active totaling 2,010 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDUKE ENERGY INDIANA
Project typeGeneration
Queue date2025-10-23

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first