Edgewater substation interconnection queue

3 active projects totaling 826.6 MW in the MISO queue.

3 MISO queue filings name Edgewater as the point of interconnection, all in Sheboygan County, WI.

3active projects
826.6active MW
3total filed
Queue IDProjectkVMWResourceStatus
R1015 Replacing 300 MW of existing coal generation with BESS; Edgewater 5 345 423.1 Hybrid Active
R1049 Replacing 303.5 MW BESS with 303.5 MW COAL; Edgewater Unit 5 345 303.5 Hybrid Active
J2055 Not reported n/r 100 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.