1 active project totaling 322 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3 MISO queue filings name E.D. Edwards as the point of interconnection, all in IL.

1active projects
322active MW
3total filed
Queue IDProjectkVMWResourceStatus
R1055 Replacing 106 MW Coal with 106 MW BESS; Edwards Unit 3 138 322 Hybrid Active
R1054 Replacing 261 MW Coal with 615 MW Solar; Edwards Unit 2 69 261 Hybrid Withdrawn
R1056 Replacing 179 MW Coal with 179 MW Solar; Edwards Unit 3 138 184.7 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.