E.D. Edwards substation interconnection queue
1 active project totaling 322 MW in the MISO queue, plus 2 with terminal status (shown grayed).
3 MISO queue filings name E.D. Edwards as the point of interconnection, all in IL.
1active projects
322active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| R1055 | Replacing 106 MW Coal with 106 MW BESS; Edwards Unit 3 | 138 | 322 | Hybrid | Active |
| R1054 | Replacing 261 MW Coal with 615 MW Solar; Edwards Unit 2 | 69 | 261 | Hybrid | Withdrawn |
| R1056 | Replacing 179 MW Coal with 179 MW Solar; Edwards Unit 3 | 138 | 184.7 | Hybrid | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.