Columbia substation interconnection queue
4 active projects totaling 795.2 MW in the MISO queue, plus 2 with terminal status (shown grayed).
4active projects
795.2active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J4144 | Not reported | n/r | 525 | Gas | Active |
| J1884 | Not reported | 345 | 200 | Battery | Withdrawn |
| J1746 | Not reported | 138 | 150 | Solar | Active |
| J2062 | Not reported | 345 | 100 | Solar | Withdrawn |
| J2761 | Not reported | n/r | 100 | Solar | Active |
| R5066 | Replacing 20 MW of solar with storage; J1746 | n/r | 20.2 | Hybrid | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.
Site Scanner