Chanarambie substation interconnection queue

3 active projects totaling 15 MW in the MISO queue.

3 MISO queue filings name Chanarambie as the point of interconnection, all in Pipestone County, MN.

3active projects
15active MW
3total filed
Queue IDProjectkVMWResourceStatus
G382 Not reported 115 8 Wind Operational
G397 Not reported 115 5 Wind Operational
G398 Not reported 115 2 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.