Substation Scout

Cadillac - Leroy substation interconnection queue

2 active projects totaling 21 MW in the MISO queue.

2 MISO queue filings name Cadillac - Leroy as the point of interconnection, all in Missaukee County, MI.

2active projects
21active MW
2total filed
Queue IDProjectkVMWResourceStatus
G566d Not reported 69 18 Wind Operational
G566 Not reported 69 3 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first