BRINKLEY EAST - AECC AUBREY substation interconnection queue

2 active projects totaling 375 MW in the MISO queue, plus 1 with terminal status (shown grayed).

3 MISO queue filings name BRINKLEY EAST - AECC AUBREY as the point of interconnection, all in AR.

2active projects
375active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3584 Not reported 230 215 Battery Withdrawn
S1101 Surplus; J1434 230 200 Battery Active
J2437 Not reported 230 175 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.