Bison substation interconnection queue
3 active projects totaling 474.8 MW in the MISO queue, plus 1 with terminal status (shown grayed).
3active projects
474.8active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J1852 | Not reported | 345 | 200 | Solar | Withdrawn |
| J3522 | Not reported | n/r | 200 | Solar | Active |
| J3157 | Not reported | n/r | 199.8 | Wind | Active |
| S1109 | Surplus; J495 | n/r | 75 | Battery | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.