Substation Scout

Big Stone South Substation substation interconnection queue

2 active projects totaling 400 MW in the MISO queue, plus 3 with terminal status (shown grayed).

2active projects
400active MW
5total filed
Queue IDProjectkVMWResourceStatus
J2624 Not reported 345 450 Battery Withdrawn
G736 Not reported 230 200 Wind Operational
J722 Not reported 230 200 Wind Active
J3017 Not reported 345 150 Solar Withdrawn
J3183 Not reported 230 125 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first