Queue request G736 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW wind project in Grant County, SD, according to Berkeley Lab’s queue data file. The filing names Big Stone South Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 1, 2019.

Queue IDG736
Project nameNot reported
Status (as published)Operational
SubstationBig Stone South Substation
Point of interconnectionBig Stone South 230kV Substation
CountyGrant
StateSD
Voltage230 kV
Capacity200 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2019-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Big Stone South Substation substation: 5 requests in the MISO queue, 2 active totaling 400 MW.

Queue IDProjectMWResourceStatus
J722Not reported200WindActive
J2624Not reported450BatteryWithdrawn
J3017Not reported150SolarWithdrawn
J3183Not reported125HybridWithdrawn

Grant, SD: 24 requests in the MISO queue, 6 active totaling 856.8 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2015-FEB West
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2007-02-02
Interconnection agreement date2016-11-21
Operational date2019-12-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first