Substation Scout

Adams Substation substation interconnection queue

4 active projects totaling 800 MW in the MISO queue, plus 4 with terminal status (shown grayed).

4active projects
800active MW
8total filed
Queue IDProjectkVMWResourceStatus
G857 Not reported 345 400 Wind Withdrawn
G172 Not reported n/r 300 Wind Operational
G113 Not reported n/r 200 Wind Operational
J030 Not reported n/r 198 Wind Withdrawn
J1072 Not reported 345 150 Solar Active
J967 Not reported 345 150 Wind Active
J029 Not reported n/r 102 Wind Withdrawn
J026 Not reported 161 50 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first