Substation Scout

MISO request G113

MISO queue ID G113

Queue request G113 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW wind project in Mower County, MN, according to Berkeley Lab’s queue data file. The filing names Adams Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of June 1, 2005.

Queue IDG113
Project nameNot reported
Status (as published)Operational
SubstationAdams Substation
Point of interconnectionAdams Substation
CountyMower
StateMN
VoltageNot reported
Capacity200 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2005-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Adams Substation substation: 8 requests in the MISO queue, 4 active totaling 800 MW.

Queue IDProjectMWResourceStatus
G172Not reported300WindOperational
J1072Not reported150SolarActive
J967Not reported150WindActive
G857Not reported400WindWithdrawn
J030Not reported198WindWithdrawn
J029Not reported102WindWithdrawn
J026Not reported50WindWithdrawn

Mower, MN: 39 requests in the MISO queue, 12 active totaling 2,228.4 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterG113 G113
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2001-08-08
Interconnection agreement date2005-04-27
Operational date2005-06-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first