Substation Scout

7KANSAS - 08SUGCRK substation interconnection queue

4 active projects totaling 716.2 MW in the MISO queue.

4 MISO queue filings name 7KANSAS - 08SUGCRK as the point of interconnection, all in Edgar County, IL.

4active projects
716.2active MW
4total filed
Queue IDProjectkVMWResourceStatus
J4002 Not reported 345 200 Battery Active
J4003 Not reported 345 200 Solar Active
J2266 Not reported 345 175 Hybrid Active
J3797 Not reported 345 141.2 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.