Substation Scout

7CLINTON - 7BROKAW substation interconnection queue

2 active projects totaling 600 MW in the MISO queue.

2 MISO queue filings name 7CLINTON - 7BROKAW as the point of interconnection, all in IL.

2active projects
600active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2377 Not reported 345 300 Battery Active
J3681 Not reported 345 300 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first