Substation Scout

Surplus

MISO queue ID S1084

Surplus (S1084) was listed in the MISO interconnection queue at the end of 2025 as a 150 MW battery project in Greene County, IN, according to Berkeley Lab’s queue data file. The filing names Worthington as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2029.

Queue IDS1084
Project nameSurplus
Status (as published)Active
SubstationWorthington
Point of interconnectionWorthington
CountyGreene
StateIN
VoltageNot reported
Capacity150 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2029-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Greene, IN: 13 requests in the MISO queue, 7 active totaling 1,305 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityHOOSIER ENERGY
Project typeGeneration
Queue date2025-01-13

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first