Substation Scout

Greene, IN interconnection queue

7 active projects totaling 1,305 MW in the MISO queue, plus 6 with terminal status (shown grayed).

7active projects
1,305active MW
13total filed
Queue IDProjectkVMWResourceStatus
J3113 Not reported 345 300 Hybrid Withdrawn
J3114 Not reported 161 300 Hybrid Active
J1419 Not reported 345 250 Solar Withdrawn
J2585 Not reported 345 240 Battery Withdrawn
J3495 Not reported 345 220 Solar Active
J2987 Not reported 345 200 Solar Active
J3494 Not reported n/r 175 Solar Withdrawn
J2747 Not reported 345 160 Solar Active
J1641 Not reported 138 150 Solar Active
S1084 Surplus n/r 150 Battery Active
J1405 Not reported 138 140 Solar Withdrawn
J2826 Not reported 161 125 Hybrid Active
J3000 Not reported 345 80 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first