Substation Scout

Surplus; J1638

MISO queue ID S1083

Surplus; J1638 (S1083) was listed in the MISO interconnection queue at the end of 2025 as a 100 MW battery project in Hancock County, KY, according to Berkeley Lab’s queue data file. The filing names Skillman as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 12, 2029.

Queue IDS1083
Project nameSurplus; J1638
Status (as published)Active
SubstationSkillman
Point of interconnectionSkillman
CountyHancock
StateKY
VoltageNot reported
Capacity100 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2029-09-12
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Skillman substation: 2 requests in the MISO queue, 1 active totaling 100 MW.

Queue IDProjectMWResourceStatus
J3726Not reported200BatteryWithdrawn

Hancock, KY: 5 requests in the MISO queue, 3 active totaling 345 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityBIG RIVERS ELECTRIC CORPORATION
Project typeGeneration
Queue date2025-01-14

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first