Surplus; J834 (S1074) was listed in the MISO interconnection queue at the end of 2025 as a 200 MW hybrid project in Phillips County, AR, according to Berkeley Lab’s queue data file. The filing names Ritchie Plant Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 30, 2027.
| Queue ID | S1074 |
|---|---|
| Project name | Surplus; J834 |
| Status (as published) | Active |
| Substation | Ritchie Plant Substation |
| Point of interconnection | Ritchie Plant 230 kV Substation |
| County | Phillips |
| State | AR |
| Voltage | 230 kV |
| Capacity | 200 MW |
| Resource (as published) | Other+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2027-09-30 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Ritchie Plant Substation substation: 2 requests in the MISO queue, 2 active totaling 300 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| J3141 | Not reported | 100 | Solar | Active |
Phillips, AR: 15 requests in the MISO queue, 9 active totaling 1,390.5 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ENTERGY ARKANSAS |
|---|---|
| Project type | Generation |
| Queue date | 2025-02-28 |
| Components (hybrid) | Other 200 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.