Surplus; J1734

MISO queue ID S1071

Surplus; J1734 (S1071) was listed in the MISO interconnection queue at the end of 2025 as a 120 MW hybrid project in Lee County, IA, according to Berkeley Lab’s queue data file. The filing names Wever - Burlington as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 7, 2025.

Queue IDS1071
Project nameSurplus; J1734
Status (as published)Active
SubstationWever - Burlington
Point of interconnectionWever - Burlington 161 kV
CountyLee
StateIA
Voltage161 kV
Capacity120 MW
Resource (as published)Other+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2025-11-07
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lee, IA: 7 requests in the MISO queue, 4 active totaling 348 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITC MIDWEST
Project typeGeneration
Queue date2024-11-15
Components (hybrid)Other 120 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.