Surplus; J1734 (S1071) was listed in the MISO interconnection queue at the end of 2025 as a 120 MW hybrid project in Lee County, IA, according to Berkeley Lab’s queue data file. The filing names Wever - Burlington as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 7, 2025.
| Queue ID | S1071 |
|---|---|
| Project name | Surplus; J1734 |
| Status (as published) | Active |
| Substation | Wever - Burlington |
| Point of interconnection | Wever - Burlington 161 kV |
| County | Lee |
| State | IA |
| Voltage | 161 kV |
| Capacity | 120 MW |
| Resource (as published) | Other+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2025-11-07 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Lee, IA: 7 requests in the MISO queue, 4 active totaling 348 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ITC MIDWEST |
|---|---|
| Project type | Generation |
| Queue date | 2024-11-15 |
| Components (hybrid) | Other 120 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.