Lee, IA interconnection queue
4 active projects totaling 348 MW in the MISO queue, plus 3 with terminal status (shown grayed).
4active projects
348active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J1471 | Not reported | 161 | 200 | Solar | Withdrawn |
| J3214 | Not reported | n/r | 185 | Hybrid | Withdrawn |
| J1734 | Not reported | 161 | 150 | Solar | Operational |
| S1071 | Surplus; J1734 | 161 | 120 | Hybrid | Active |
| G258 | Not reported | n/r | 50 | Gas | Operational |
| G732 | Not reported | 13.2 | 34 | Coal | Withdrawn |
| G761 | Not reported | 69 | 28 | Coal | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.