Lee, IA interconnection queue

4 active projects totaling 348 MW in the MISO queue, plus 3 with terminal status (shown grayed).

4active projects
348active MW
7total filed
Queue IDProjectkVMWResourceStatus
J1471 Not reported 161 200 Solar Withdrawn
J3214 Not reported n/r 185 Hybrid Withdrawn
J1734 Not reported 161 150 Solar Operational
S1071 Surplus; J1734 161 120 Hybrid Active
G258 Not reported n/r 50 Gas Operational
G732 Not reported 13.2 34 Coal Withdrawn
G761 Not reported 69 28 Coal Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.