Substation Scout

Surplus; J1132

MISO queue ID S1070

Surplus; J1132 (S1070) was listed in the MISO interconnection queue at the end of 2025 as a 40 MW hybrid project in Union County, IA, according to Berkeley Lab’s queue data file. The filing names ROUNDHOUSEJ1 as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 1, 2025.

Queue IDS1070
Project nameSurplus; J1132
Status (as published)Active
SubstationROUNDHOUSEJ1
Point of interconnectionROUNDHOUSEJ1
CountyUnion
StateIA
VoltageNot reported
Capacity40 MW
Resource (as published)Other+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2025-08-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Union, IA: 4 requests in the MISO queue, 3 active totaling 140 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITC MIDWEST
Project typeGeneration
Components (hybrid)Other 40 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.