Substation Scout

Union, IA interconnection queue

3 active projects totaling 140 MW in the MISO queue, plus 1 with terminal status (shown grayed).

3active projects
140active MW
4total filed
Queue IDProjectkVMWResourceStatus
J1132 Not reported 69 50 Solar Active
J2951 Not reported n/r 50 Hybrid Active
S1070 Surplus; J1132 n/r 40 Hybrid Active
J1476 Not reported 69 25 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first