MISO queue ID S1061

Surplus; G905 (S1061) was listed in the MISO interconnection queue at the end of 2025 as a 50 MW hybrid project in Midland County, MI, according to Berkeley Lab’s queue data file. The filing names Redstone - Bus # as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 30, 2026.

Queue IDS1061
Project nameSurplus; G905
Status (as published)Active
SubstationRedstone - Bus #
Point of interconnectionRedstone 138 kV - Bus #256543
CountyMidland
StateMI
Voltage138 kV
Capacity50 MW
Resource (as published)Other+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2026-09-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Midland, MI: 17 requests in the MISO queue, 6 active totaling 993.2 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
Project typeGeneration
Queue date2024-08-01
Components (hybrid)Other 50 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first