Substation Scout

Surplus; J1369

MISO queue ID S1043

Surplus; J1369 (S1043) was listed in the MISO interconnection queue at the end of 2025 as a 50 MW hybrid project in Dubois County, IN, according to Berkeley Lab’s queue data file. The filing names Culley to Dubois tap as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 7, 2024.

Queue IDS1043
Project nameSurplus; J1369
Status (as published)Active
SubstationCulley to Dubois tap
Point of interconnectionCulley to Dubois 138kV tap
CountyDubois
StateIN
Voltage138 kV
Capacity50 MW
Resource (as published)Other+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2024-04-07
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Dubois, IN: 9 requests in the MISO queue, 7 active totaling 610 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySouthern Indiana Gas & Electric Company d/b/a Centerpoint Energy Indiana South
Project typeGeneration
Queue date2023-04-17
Components (hybrid)Other 50 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first