Surplus; Pine River Solar

MISO queue ID S1021

Surplus; Pine River Solar (S1021) was listed in the MISO interconnection queue at the end of 2025 as a 80 MW hybrid project in Gratiot County, MI, according to Berkeley Lab’s queue data file. The filing names Luce Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2023.

Queue IDS1021
Project nameSurplus; Pine River Solar
Status (as published)Active
SubstationLuce Substation
Point of interconnectionLuce Substation
CountyGratiot
StateMI
VoltageNot reported
Capacity80 MW
Resource (as published)Solar+Other
Resource categoryHybrid (normalized for filtering)
Proposed online date2023-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Gratiot, MI: 25 requests in the MISO queue, 14 active totaling 1,723.3 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2022-04-25
Interconnection agreement date2022-05-17
Components (hybrid)Solar 80 MW + Other

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.