Substation Scout

MISO request R41

MISO queue ID R41

Queue request R41 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW wind project in Adair County, IA, according to Berkeley Lab’s queue data file. The filing names MEC Council Bluffs - Grimes as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of October 1, 2009.

Queue IDR41
Project nameNot reported
Status (as published)Operational
SubstationMEC Council Bluffs - Grimes
Point of interconnectionMEC Council Bluffs - Grimes 345 kV
CountyAdair
StateIA
Voltage345 kV
Capacity100 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2009-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

MEC Council Bluffs - Grimes substation: 2 requests in the MISO queue, 2 active totaling 300 MW.

Queue IDProjectMWResourceStatus
R38Not reported200WindOperational

Adair, IA: 15 requests in the MISO queue, 8 active totaling 2,181 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2007-04-17
Interconnection agreement date2009-08-31
Operational date2009-10-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.