MISO request R15

MISO queue ID R15

Queue request R15 was listed in the MISO interconnection queue at the end of 2025 as a 80 MW wind project in Pocahontas County, IA, according to Berkeley Lab’s queue data file. The filing names Pomeroy substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of July 1, 2006.

Queue IDR15
Project nameNot reported
Status (as published)Operational
SubstationPomeroy substation
Point of interconnectionPomeroy 161 kV substation
CountyPocahontas
StateIA
Voltage161 kV
Capacity80 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2006-07-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Pocahontas, IA: 5 requests in the MISO queue, 2 active totaling 236.3 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2003-04-11
Interconnection agreement date2009-12-23
Operational date2006-07-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.