Pocahontas, IA interconnection queue

2 active projects totaling 236.3 MW in the MISO queue, plus 3 with terminal status (shown grayed).

2active projects
236.3active MW
5total filed
Queue IDProjectkVMWResourceStatus
J2481 Not reported 345 300 Wind Withdrawn
J1978 Not reported 161 175 Wind Withdrawn
J3137 Not reported 161 156.3 Solar Active
G315 Not reported n/r 80 Wind Withdrawn
R15 Not reported 161 80 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.