Replacing 258MW ERIS gas/oil with 237MW ERIS Natural Gas/oil; Wheaton 1-4
MISO queue ID R1045
Replacing 258MW ERIS gas/oil with 237MW ERIS Natural Gas/oil; Wheaton 1-4 (R1045) was listed in the MISO interconnection queue at the end of 2025 as a 237 MW hybrid project in Chippewa County, MN, according to Berkeley Lab’s queue data file. The filing names Wheaton as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 3, 2025.
| Queue ID | R1045 |
|---|---|
| Project name | Replacing 258MW ERIS gas/oil with 237MW ERIS Natural Gas/oil; Wheaton 1-4 |
| Status (as published) | Active |
| Substation | Wheaton |
| Point of interconnection | Wheaton 161kV |
| County | Chippewa |
| State | MN |
| Voltage | 161 kV |
| Capacity | 237 MW |
| Resource (as published) | Gas+Other |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2025-06-03 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Chippewa, MN: 3 requests in the MISO queue, 1 active totaling 237 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | NORTHERN STATES POWER COMPANY |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Queue date | 2024-03-01 |
| Components (hybrid) | Gas 237 MW + Other |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.