Substation Scout

Chippewa, MN interconnection queue

1 active project totaling 237 MW in the MISO queue, plus 2 with terminal status (shown grayed).

1active projects
237active MW
3total filed
Queue IDProjectkVMWResourceStatus
R1045 Replacing 258MW ERIS gas/oil with 237MW ERIS Natural Gas/oil; Wheaton 1-4 161 237 Hybrid Active
J1647 Not reported 115 150 Solar Withdrawn
J1693 Not reported 115 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.