Substation Scout

Replacing 220 MW of coal generation with BESS; Trenton Channel 9

MISO queue ID R1041

Replacing 220 MW of coal generation with BESS; Trenton Channel 9 (R1041) was listed in the MISO interconnection queue at the end of 2025 as a 220 MW hybrid project in Wayne County, MI, according to Berkeley Lab’s queue data file. The filing names TCHPP Position JC as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 31, 2025.

Queue IDR1041
Project nameReplacing 220 MW of coal generation with BESS; Trenton Channel 9
Status (as published)Active
SubstationTCHPP Position JC
Point of interconnectionTCHPP Position JC 120kV
CountyWayne
StateMI
Voltage120 kV
Capacity220 MW
Resource (as published)Other+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2025-05-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Wayne, MI: 23 requests in the MISO queue, 12 active totaling 2,589.5 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
Interconnection serviceNRIS
Project typeGeneration
Queue date2023-10-11
Components (hybrid)Other 220 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.