Substation Scout

Replacing 49 MW of gas generation with BESS; Sterlington

MISO queue ID R1039

Replacing 49 MW of gas generation with BESS; Sterlington (R1039) was listed in the MISO interconnection queue at the end of 2025 as a 49 MW hybrid project in Ouachita County, LA, according to Berkeley Lab’s queue data file. The filing names Sterlington as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 31, 2025.

Queue IDR1039
Project nameReplacing 49 MW of gas generation with BESS; Sterlington
Status (as published)Active
SubstationSterlington
Point of interconnectionSterlington 115kV
CountyOuachita
StateLA
Voltage115 kV
Capacity49 MW
Resource (as published)Solar+Other
Resource categoryHybrid (normalized for filtering)
Proposed online date2025-01-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Ouachita, LA: 1 request in the MISO queue, 1 active totaling 49 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY LOUISIANA
Interconnection serviceNRIS
Project typeGeneration
Queue date2023-10-05
Components (hybrid)Solar 49 MW + Other

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.