Substation Scout

Ouachita, LA interconnection queue

1 active project totaling 49 MW in the MISO queue.

1active projects
49active MW
1total filed
Queue IDProjectkVMWResourceStatus
R1039 Replacing 49 MW of gas generation with BESS; Sterlington 115 49 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.