Ouachita, LA interconnection queue
1 active project totaling 49 MW in the MISO queue.
1active projects
49active MW
1total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| R1039 | Replacing 49 MW of gas generation with BESS; Sterlington | 115 | 49 | Hybrid | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.