Queue request J984 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW wind project in Gratiot County, MI, according to Berkeley Lab’s queue data file. The filing names Nelson Road ‚Äì Murphy line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 31, 2022.

Queue IDJ984
Project nameNot reported
Status (as published)Active
SubstationNelson Road – Murphy line
Point of interconnectionNelson Road – Murphy 345kV line
CountyGratiot
StateMI
Voltage345 kV
Capacity200 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2022-10-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Gratiot, MI: 25 requests in the MISO queue, 14 active totaling 1,723.3 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP-2018-APR East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: Under Construction
Queue date2018-03-12
Interconnection agreement date2021-05-07
Operational date2023-12-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first