MISO request J982

MISO queue ID J982

Queue request J982 was listed in the MISO interconnection queue at the end of 2025 as a 300 MW wind project in Dickinson County, IA, according to Berkeley Lab’s queue data file. The filing names Obrien County - Kossuth Line Tap as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 15, 2024.

Queue IDJ982
Project nameNot reported
Status (as published)Active
SubstationObrien County - Kossuth Line Tap
Point of interconnectionObrien County - Kossuth 345 kV Line Tap
CountyDickinson
StateIA
Voltage345 kV
Capacity300 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2024-03-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Dickinson, IA: 6 requests in the MISO queue, 4 active totaling 494 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMIDAMERICAN ENERGY COMPANY
ClusterDPP-2018-APR West
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: Not Started
Queue date2018-03-12
Interconnection agreement date2022-02-07

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.