Dickinson, IA interconnection queue
4 active projects totaling 494 MW in the MISO queue, plus 2 with terminal status (shown grayed).
4active projects
494active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J982 | Not reported | 345 | 300 | Wind | Active |
| J2040 | Not reported | 345 | 150 | Wind | Withdrawn |
| G298 | Not reported | 161 | 100 | Wind | Operational |
| J068 | Not reported | 161 | 100 | Wind | Withdrawn |
| G538 | Not reported | 161 | 50 | Wind | Operational |
| G232 | Not reported | n/r | 44 | Wind | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.